Warning: imagepng(/homepages/2/d278316518/htdocs/wp-content/uploads/gravity_forms/0-e956979b5ea7b34f7a16f85f6e2a4296/729631713.png): failed to open stream: Disk quota exceeded in /homepages/2/d278316518/htdocs/wp-content/plugins/really-simple-captcha/really-simple-captcha.php on line 147
Warning: fopen(/homepages/2/d278316518/htdocs/wp-content/uploads/gravity_forms/0-e956979b5ea7b34f7a16f85f6e2a4296/729631713.txt): failed to open stream: Disk quota exceeded in /homepages/2/d278316518/htdocs/wp-content/plugins/really-simple-captcha/really-simple-captcha.php on line 170
Black Oak Stormwater Sewer Interceptor Project – Phase II
Share this Project
Project at a Glance
Location: Gary, IN Value: $2 M
Project Overview:
Scope of work includes removal and Replacement of the existing roadway; constructing the addition of a curb and gutter; performing the filling of adjoining ditches; constructing the addition of a storm drainage system which conveys the storm water to a manhole located at the intersection of 25th Avenue and Burr Street in Gary, Indiana.