TDOT I-440 widening schedule

TDOT I-440 widening schedule

Share this Project

Project at a Glance

Location: Tennessee
Value: $100M
Contractor’s name: The Walsh Group


Project Overview:

The Walsh Group

The project scope involves replacing deteriorated concrete with asphalt, adding capacity by installing a third lane in each direction where currently there are only two, which will not require additional right-of-way.

Moreover, eliminating the elevated grassy median throughout the corridor and replacing with a concrete median barrier wall. And lastly, widening the I-440 bridges over I-65 to three lanes in each direction.

HSE was awarded the project with a vital role in the creating a detailed baseline schedule including cost and resource loading on all construction activities. The project is currently on time.




Contact Us

Call Us 1-888-398-8283 Office Locations

Email us for more info about our Construction Scheduling Services

Download our Brochures

HSE Contractors Brochure

View our Work Samples

4d Modeling Samples
CPM Schedule Report Sample


Let Us Contact You