TDOT I-440 widening schedule

TDOT I-440 widening schedule

Share this Project

Project at a Glance

Location: Tennessee
Value: $100M
Contractor’s name: The Walsh Group


Project Overview:

The Walsh Group

The project scope involves replacing deteriorated concrete with asphalt, adding capacity by installing a third lane in each direction where currently there are only two, which will not require additional right-of-way.

Moreover, eliminating the elevated grassy median throughout the corridor and replacing with a concrete median barrier wall. And lastly, widening the I-440 bridges over I-65 to three lanes in each direction.

HSE was awarded the project with a vital role in the creating a detailed baseline schedule including cost and resource loading on all construction activities. The project is currently on time.




Contact Us

Call Us 1-888-398-8283 Office Locations

Email us for more info about our Construction Scheduling Services


Download our Brochures

Flagship Projects
Multi-Family Residential Projects
Waste Water & Used Oil Treatment
Residential Projects
Roadways & Bridges Projects
High-rise Projects
Federal Projects
Airport Projects
Commercial Projects

View our Work Samples

4d Modeling Samples
CPM Schedule Report Sample

Let Us Contact You