Repair Base Energy Audits

Repair Base Energy Audits

Share this Project

Project at a Glance

Location: San Diego, CA
Value: $5,996,102
General Contractor: Countywide Mechanical Systems Inc.


Project Overview:

This project consists of repair work for Mechanical and Electrical systems in 8 separate buildings located at MCAS Miramar, San Diego, CA from base energy audits. The scope of work includes removing and replacing the ventilating and air conditioning (HVAC) equipment and lighting in 8 separate building. HSE Contractors is also working on other Task orders for Countywide Mechanical Systems Inc:

– HVAC/DDC replacement, Miramar (T 003)
– Repair Chilled Water Plants (T005)
– 29 Palms DDC Replacement (T006)
– Boiler Replacement NASM Monitor (T007)




Contact Us

Call Us 1-888-398-8283 Office Locations

Email us for more info about our Construction Scheduling Services


Download our Brochures

Flagship Projects
Multi-Family Residential Projects
Waste Water & Used Oil Treatment
Residential Projects
Roadways & Bridges Projects
High-rise Projects
Federal Projects
Airport Projects
Commercial Projects

View our Work Samples

4d Modeling Samples
CPM Schedule Report Sample

Let Us Contact You