Peabody Water Bridge

Peabody Water Bridge

Share this Project

Project at a Glance

Location: Peabody, MA
Value: $2.4M
General Contractor: Kodiak Corporation Inc.


Project Overview:

Peabody Water Bridge construction CPM Scheduling

The proposed project includes the demolition of the existing bridge that carries Howley Street over North River and the construction of a new one or two span bridge. The roadway and bridge approaches will remain in the existing footprint. The new bridge will consist of two travel lanes with shoulders, curb and sidewalk, and steel rail on both sides. Two lanes of traffic will be maintained during construction.



Contact Us

Call Us 1-888-398-8283 Office Locations

Email us for more info about our Construction Scheduling Services

Download our Brochures

Commercial Projects
Multi-Family Residential Projects
Waste Water & Used Oil Treatment
Flagship Projects
Residential Projects
Roadways & Bridges Projects
High-rise Projects
Federal Projects
Airport Projects

View our Work Samples

4d Modeling Samples
CPM Schedule Report Sample


Let Us Contact You