HSE Contractors CPM Scheduling Projects By Industry Maritime Pertaining to construction of two fireboats for port of long beach, CA

Pertaining to construction of two fireboats for port of long beach, CA

Pertaining to construction of two fireboats for port of long beach, CA

Share this Project

Project at a Glance

Location: California
Value: $45 M
Project Owner: Fisher Maritime Constructing Group


Project Overview:

Fisher maritime constructing group

The project scope involved the pertaining to construction of the first of two new 108’x35’ fireboats to replace the port’s 1980s-era responder vessels with 400% more firefighting power. The Protector, mounts 10 water cannons with a capacity to throw more than 41,000 gpm, or four times the output of the port’s present fire boats. Pumping range is 600’ and higher than a 20-story building, enough power to project water or foam “anywhere aboard the world’s largest container ships and oil tankers,” according to a statement from port officials. HSE was responsible for creating a detailed baseline schedule for the project including cost and resource loading on all construction activities. HSE was successful in obtaining approvals on all of the scheduling submittals without any delays to the contractor. The project is currently on time.




Contact Us

Call Us 1-888-398-8283 Office Locations

Email us for more info about our Construction Scheduling Services


Download our Brochures

Flagship Projects
Multi-Family Residential Projects
Waste Water & Used Oil Treatment
Residential Projects
Roadways & Bridges Projects
High-rise Projects
Federal Projects
Airport Projects
Commercial Projects

View our Work Samples

4d Modeling Samples
CPM Schedule Report Sample

Let Us Contact You