HSE Contractors CPM Scheduling Projects By Industry Clients NYCMTA LIRR 6148 Elevator Replacements at Woodside & Merrick Stations

Warning: imagepng(/homepages/2/d278316518/htdocs/wp-content/uploads/gravity_forms/0-e956979b5ea7b34f7a16f85f6e2a4296/1265845369.png): failed to open stream: Disk quota exceeded in /homepages/2/d278316518/htdocs/wp-content/plugins/really-simple-captcha/really-simple-captcha.php on line 147

Warning: fopen(/homepages/2/d278316518/htdocs/wp-content/uploads/gravity_forms/0-e956979b5ea7b34f7a16f85f6e2a4296/1265845369.txt): failed to open stream: Disk quota exceeded in /homepages/2/d278316518/htdocs/wp-content/plugins/really-simple-captcha/really-simple-captcha.php on line 170

LIRR 6148 Elevator Replacements at Woodside & Merrick Stations

LIRR 6148 Elevator Replacements at Woodside & Merrick Stations

Share this Project

Project at a Glance

Location: Queens, NY
Value: $ 2.3M
General Contractor: Maxxum Construction Corp.
Owner: Metropolitan Transportation Authority (MTA)


Project Overview:

LIRR 6148 Elevator Replacements at Woodside & Merrick Stations Construction CPM Scheduling

It is our philosophy at HSE to deliver professional engineering services in a cost effective and timely manner. This project was carried out in a way that fully satisfies our philosophy and preset requirements. The owner was pleased to an extent that he assigned us new projects and become a member of our ever-growing list of returning clients.



Contact Us

Call Us 1-888-398-8283 Office Locations

Email us for more info about our Construction Scheduling Services

Download our Brochures

HSE Contractors Brochure

View our Work Samples

4d Modeling Samples
CPM Schedule Report Sample


Let Us Contact You