Scope of work consists of repairing the arches and replacing the parapets, sidewalks, lighting, and the bridge deck. MassDOT is carrying out the rehabilitation project as part of the Patrick-Murray Administration’s eight-year, $3 billion Accelerated Bridge Program, which is repairing or replacing structurally-deficient bridges across the Commonwealth. HSE Contractors Inc. was hired by Barletta Construction to build a complete cost and resource loaded baseline schedule.