George Washington Bridge (NY)

George Washington Bridge (NY)

Share this Project

Project at a Glance

Location: New York, NY
Value: $6.1 M


Project Overview:

George Washington Bridge (NY) CPM Scheduling

This project scope of work is to maintain the upper level roadway in a state of good repair for the commuters between New York and New Jersey. The project consists of removing portions of the upper level orthotropic deck and replace with prefabricated, pre-paved orthotropic deck panels, installation and modification of structural steel, repair of structural steel members, installation of drainage scuppers and appurtenances repaving Westbound Upper Level asphalt surfaced steel bridge deck, and rehabilitation of finger joints.




Contact Us

Call Us 1-888-398-8283 Office Locations

Email us for more info about our Construction Scheduling Services


Download our Brochures

Flagship Projects
Multi-Family Residential Projects
Waste Water & Used Oil Treatment
Residential Projects
Roadways & Bridges Projects
High-rise Projects
Federal Projects
Airport Projects
Commercial Projects

View our Work Samples

4d Modeling Samples
CPM Schedule Report Sample

Let Us Contact You