The work consists, in general, of furnishing all permits, materials, labor, tools, and equipment, and for doing all the work involved in reconstructing a section of Derby Avenue, E 10th Street, and San Leandro Street, Pavement overlay will be constructed at Derby Avenue at its intersections with E 12th Street (NB & SB) and at the intersection of Fruitvale Avenue and E10th Street/San Leandro Street. New pavement sections will be constructed at Derby Avenue and E 10th Street. Concrete curb ramps, driveways, curb and gutter and sidewalk will be constructed. Signal and lighting will be installed or modified at two (2) intersections. Pavement delineation and signs will be installed, drainage system will be modified, and roadway lighting will be installed.