WYA Data Center Campus

WYA Data Center Campus

Share this Project


Project at a Glance

Location: Wyoming (WYA)
Value: $6.8 Billion
Owner: Vantage Data Centers
General Contractor: To Be Determined
Campus Code: WYA Data Center Campus (Buildings 1–4)
HSE Services: CPM Baseline Scheduling – Cost-Time Analysis

Project Overview:

The Wyoming Campus (WYA) is a massive hyperscale data center development comprising an initial footprint of four full data center buildings. Engineered to support civilization-scale AI workloads and cloud architecture, this mission-critical project features an immense 1.2-gigawatt power requirement, representing one of the largest digital infrastructure power constraints in the region. The project is currently transitioning through Gate 2 due diligence, demanding meticulous coordination across land acquisition, air permitting approvals, early design work package (WSA) swim lanes, and high-voltage power generation milestones to establish a robust master template.

HSE provided end-to-end project controls support for the campus, including CPM scheduling and cost-time analysis. Through detailed schedule planning, logic review, progress tracking, and proactive coordination, HSE helped ensure that each phase of the work was carefully planned, monitored, and executed on time.



Contact Us

Call Us 1-888-398-8283 Office Locations

Email us for more info about our Construction Scheduling Services


Download our Brochures

Flagship Projects
Multi-Family Residential Projects
Waste Water & Used Oil Treatment
Residential Projects
Roadways & Bridges Projects
High-rise Projects
Federal Projects
Airport Projects
Commercial Projects

View our Work Samples

4d Modeling Samples
CPM Schedule Report Sample

Let Us Contact You