TUL1 – Tulsa AI-Optimized Data Center Campus

TUL1 – Tulsa AI-Optimized Data Center Campus

Share this Project


Project at a Glance

Location: Tulsa, Oklahoma
Value: $4.2 Billion
Owner: FluidStack
General Contractor: Alston Construction
Campus Code: TUL1 (Tulsa AI-Optimized Data Center Campus)
HSE Services: Baseline Scheduling – Cost-Time Analysis

Project Overview:

The Tulsa Campus (TUL1) is a massive FluidStack hyperscale AI data center campus in Oklahoma, purpose-built from the ground up for high-performance computing and AI workloads. This mission-critical development represents a major, frontier investment in regional digital infrastructure, custom-engineered to handle heavy GPU cluster densities that require advanced liquid cooling architectures and rapid power grid integrations. The project demands strict, accelerated coordination across fast-tracked structural construction, specialized power equipment procurement, multi-phase hardware installation, and complex live commissioning phases.

HSE provides end-to-end project controls support for the campus build-out, including CPM scheduling and continuous cost-time analysis. Through rapid schedule planning, advanced logic reviews, precise progress tracking, and proactive trade coordination, HSE helps ensure that every fast-tracked phase of the structural and mechanical work is safely planned, meticulously monitored, and executed ahead of traditional market timelines.



Contact Us

Call Us 1-888-398-8283 Office Locations

Email us for more info about our Construction Scheduling Services


Download our Brochures

Flagship Projects
Multi-Family Residential Projects
Waste Water & Used Oil Treatment
Residential Projects
Roadways & Bridges Projects
High-rise Projects
Federal Projects
Airport Projects
Commercial Projects

View our Work Samples

4d Modeling Samples
CPM Schedule Report Sample

Let Us Contact You